Trimess

Friday, May 27, 2011

Time to reboot the Sellwood Bridge?

Discussion
Given all of that--if the existing project constraints were mostly removed, and the region had $200 million to build a southern crossing wherever it liked--where would you put it, how would you fund it, who would run it, and what would it look like? To make this interesting, feel free to imagine other connecting infrastructure projects in the future, if you like.
And if you think that the $200 million ought to be spent elsewhere entirely, or pocketed--with no more vehicular crossing of the Willamette between Oregon City and downtown after the existing bridge reaches the end of its useful life, feel free to say that as well.

Portland Transport

No comments: