Trimess

Tuesday, August 27, 2013

MAX FAQ's

and here’s how that area looks as of this month.
 Long story short, frontline workers had been trying to address long-standing safety issues at TriMet, including damage to the alignment that had gone unrepaired for months (example – the switches just west of the Lloyd Center platform, pictured here in July of 2012 and again in January 2013 with no repairs made). Nothing was being done internally, so the union brought it to the media, which then led to ODOT announcing an inspection. Cue a flurry of activity at TriMet which largely consisted of throwing asphalt on everything to patch the alignment up before the inspection (here are the same switches in mid-March 2013). As a result, the ODOT report didn’t find any major safety concerns. TriMet claimed this as a victory and accused the union of making up safety issues to draw attention away from the negotiations. Though really, it’s a dubious victory if you have to do a bunch of last minute work right before an inspection to fix problems that had been around for months – doesn’t that just mean the union was right?
  
In with the new, disregard the old

No comments: